DANIDA. EIMP Phasing-out Phase, 2003-2004. Audits to selected monitoring sites in Egypt, October 2004.

Publication details

Publication type: Research report

Series: NILU OR (NILU Oppdragsrapport), 78/2004

Publisher: NILU

Summary:

During the last mission in EIMP Phasing-out Phase in October 2004 some selected monitoring sites were audited by Rolf Dreiem. The results from the audits are from very good sites to bad. Details in the work and equipment vary a lot at different sites. Most of the technicians are doing a good work, but do not have all tools, gases and transportation they need to perform better.